- Service Solutions
- Inspection
- Conventional NDT
- Advanced NDT
- Electromagnetic Acoustic Transducer (EMAT)
- Alternating Ground Current Field Measurement (ACFM)
- Phased Array Ultrasonic Testing (PAUT)
- Guided Wave Testing (GWT)
- Automated Ultrasonics Testing (AUT)
- Computed Radiography Testing (CRT)
- Eddy Current Testing (ECT)
- Remote Field Testing (RFT)
- Magnetic Flux Leakage Inspection (MFL)
- Robotic Inspection Solutions
- Rope Access Inspection
- Tank Inspection & Engineering
- Quest Integrity
- Maintenance & Repair
- Heat Treating
- Advanced Engineering & Mechanical Integrity
- Valve Products & Repair
- Emissions Control
- Inspection
- Integrated Solutions
- Industry Solutions
- Digital Solutions
- About
- Investors
- Locations
- Contact
- Technical School
- Service Solutions
- Inspection
- Conventional NDT
- Advanced NDT
- Electromagnetic Acoustic Transducer (EMAT)
- Alternating Ground Current Field Measurement (ACFM)
- Phased Array Ultrasonic Testing (PAUT)
- Guided Wave Testing (GWT)
- Automated Ultrasonics Testing (AUT)
- Computed Radiography Testing (CRT)
- Eddy Current Testing (ECT)
- Remote Field Testing (RFT)
- Magnetic Flux Leakage Inspection (MFL)
- Robotic Inspection Solutions
- Rope Access Inspection
- Tank Inspection & Engineering
- Quest Integrity
- Maintenance & Repair
- Heat Treating
- Advanced Engineering & Mechanical Integrity
- Valve Products & Repair
- Emissions Control
- Inspection
- Integrated Solutions
- Industry Solutions
- Digital Solutions
- About
- Investors
- Locations
- Contact
- Technical School
Search This Site
Type the word or exact phrase to search for:
Jun 14, 2018
In partnership with our most progressive customers, TEAM continues to develop robust on-line leak repair procedures that ensure operators are guided down the correct path in terms of piping...
May 2, 2018
A total valve replacement can consist of full removal and installation with bolting and torquing, on-site or shop machining, weld repair and heat treatment, lapping and grinding of valve seats, and...
Apr 5, 2018
High-energy piping (HEP) systems operate at extreme pressures and temperatures where a number of damage mechanisms can cause wall thinning, cracking, material degradation or other component failures.
Mar 22, 2018
When it comes to heat treating, there is no one option that fits all. Taking this route can cause catastrophic outcomes.
Feb 6, 2018
Often, a local spot or “bull’s eye” PWHT configuration is allowed for PWHT of attachment or repair welds. Both the ASME Boiler and Pressure Vessel Code (BPVC) and the National Board Inspection...
Nov 6, 2017
Both joints are used on the same line with the same pressure, same processes, same cycling and same stresses. Yet, one joint is often fabricated with a certified technician, tested and inspected,...
All Content © 2022 TEAM Inc. All Rights Reserved.